SEO

March 19, 2011

Charlie Sheen adds five cities to national tour | Reuters

Charlie Sheen adds five cities to national tour

File photo of actor Charlie Sheen as he gestures towards fans in Aspen, Colorado August 2, 2010. REUTERS/Rick Wilking/Files

File photo of actor Charlie Sheen as he gestures towards fans in Aspen, Colorado August 2, 2010.

Credit: Reuters/Rick Wilking/Files

LOS ANGELES | Wed Mar 16, 2011 6:16am IST

LOS ANGELES

(Reuters) - Charlie Sheen on Tuesday added five new shows to the schedule of live performances he has mounted in the wake of being fired last week from his hit television program "Two And A Half Men."

Sheen's "My Violent Torpedo of Truth/Defeat is Not an Option Show" will expand beyond previous cities of Detroit and Chicago to include New York City, Boston, Cleveland, Columbus, Ohio and Wallingford, Conn.

The new shows were posted on the sales site of Ticketmaster. The trek currently begins on April 5 in Cleveland and ends one week later in Boston. The new stops were added following reports over the weekend that the first two shows sold out quickly.

Sheen, who was TV's highest paid actor for his role as a skirt-chasing, heavy-drinking bachelor on No. 1-rated comedy "Two And A Half Men," has made headlines worldwide since January when he entered a home-based rehab program for drug and alcohol abuse. Production of his show was suspended.

After completing treatment, the actor said he wanted to return to work, but the show's producer Chuck Lorre, its makers at Warner Bros Television and the CBS network that aired it kept the program on hold.

Sheen went on several radio and TV interviews, complaining loudly about Warner Bros. and insulting Lorre by calling him "a stupid, stupid little man," among many other things. Warner Bros then fired him. He has sued both Warner Bros and Lorre for $100 million claiming he was wrongfully terminated.

For its part, Warner Bros. has claimed in a letter to Sheen's lawyer that the actor was engaged in "dangerously self-destructive conduct and appears to be very ill." Warner Bros. said Sheen had difficulty remembering lines, could not collaborate and had poisoned key working relationships.

Indeed, Sheen has had a troubled 2010, pleading guilty to assaulting his now ex-wife, being put on probation, spending several stints in rehab and in hospitals.

In recent weeks, he has gone on a personal media blitz starting a webcast called "Sheen's Korner," in which he talks about whatever is on his mind, and opening his own Twitter account to stay connected to fans.

Not much is known about his show beyond the description on the Ticketmaster site, which reads: "Will there be surprises? Will there be guests? Will there be mayhem? Will you laugh? Will you scream? Will you know the truth? WILL THERE BE MORE?!?! This IS where you will hear the REAL story from the Warlock. Bring it. I dare you to keep up with me."

(Editing by Dean Gooodman)

March 17, 2011

turn_a_whirlwind_of_lust

URGENT: Hasidic Mumps Outbreak - CDC Radio

Search Posterous for 'feedproxy/dogmeat'

A northbound Saikyō Line train bound for Kawagoe takes on Elvis Karate Monkey

*East Japan Railway Company, EMU type 205 *Sai...Image via Wikipedia
A northbound Saikyō Line train bound for Kawagoe takes on Elvis Karate Monkey


Line Station name km Stops Location

Yamanote Ōsaki 0.0 L R C Shinagawa Tokyo

Ebisu 3.6 L R C Shibuya

Shibuya 5.2 L R C

Shinjuku 8.6 L R C Shinjuku

Ikebukuro 13.4 L R C Toshima

Akabane

Itabashi 15.2 L R C Itabashi

Jūjō 16.9 L R C Kita

Akabane 18.9 L R C

Tōhoku

Kita-Akabane 20.4 L

Ukima-Funado 22.0 L

Toda-Kōen 24.4 L R Toda Saitama

Toda 25.7 L

Kita-Toda 27.1 L

Musashi-Urawa 29.5 L R C Minami-ku,

Saitama

Naka-Urawa 30.7 L

Minami-Yono 32.4 L Chūō-ku,

Saitama

Yono-Honmachi 34.0 L R

Kita-Yono 35.1 L

Ōmiya 36.9 L R C Ōmiya-ku,

Saitama



    The Saikyō Line (埼京線, Saikyō-sen?, an abbreviation for "Saitama-Tokyo Line") is a railway line between Ōsaki Station in Shinagawa, Tokyo) and Ōmiya Station (Ōmiya Ward, Saitama, Japan).


    At the northern end of the line, some trains continue beyond Ōmiya as far as Kawagoe Station on the Kawagoe Line. At Ōsaki, most Saikyō Line trains continue onward to Shin-Kiba on the Rinkai Line operated by Tokyo Waterfront Area Rapid Transit.


    The line runs parallel to the Yamanote Line between Ōsaki and Ikebukuro, where it is formally called the Yamanote Freight Line (山手貨物線?), and to the Tōhoku Main Line between Akabane and Ōmiya, where it is unofficially called the Second Tohoku Line (東北別線?). The portion between Ikebukuro and Akabane is officially known as the Akabane Line (赤羽線?). For most purposes, JR refers to all of these as part of the "Saikyō Line" when being used for Saikyō Line services.


Before the Saikyō Line, there were several attempts to improve commuter rail service between Saitama and Tokyo. One of the earliest, the Tokyo-Ōmiya Electric Railway (東京大宮電気鉄道, Tōkyō-Ōmiya Denki Tetsudō?), was founded in 1928 but went bankrupt shortly thereafter due to rising land values in the area. Later, in 1968, the Tokyo Metropolitan Board of Transportation proposed to run the new Toei Mita Line to central Ōmiya.



Development of the Saikyō Line began as a Japanese National Railways effort to quell unrest in Saitama regarding the expansion of the Tōhoku and Jōetsu Shinkansen. During the mid-1970s, local protesters staged sit-ins, demonstrations and administrative actions to impede the building of the new high-speed lines north of Tokyo. JNR reached a settlement with the activists under which it would build a commuter line to serve these local communities, while being left alone to develop the Shinkansen as well.


The new line, tentatively called the New Commuter Line (通勤新線, Tsūkin Shinsen?), was built between Ōmiya and Akabane. Through service to Ikebukuro through the existing Akabane Line began on September 30, 1985. The line was initially troubled by inadequate train control systems which could not keep pace with its frequency of service: however, these issues were worked out during the first month of service.


In March 1986, the Saikyō Line began through service to Shinjuku through the Yamanote Freight Line, which had seen less use by freight services since the opening of the Musashino Line in 1973. Service to Shibuya and Ebisu did not begin until 1996, when new platforms were completed to accommodate passenger service. Service to Ōsaki and the Rinkai Line began in 2001.


The Saikyō Line has had a particularly severe problem of overcrowding during rush hour. Some of the traffic was redirected to Shōnan-Shinjuku Line upon completion of line extension construction in 2004. The completion of the Tokyo Metro Fukutoshin Line in 2008, which also serves the Saitama-Yamanote corridor, is expected to bring more relief. Problems of overcrowding have included a higher incidence of groping, as well as delays in train schedule caused by longer time taken at each station to pick up and drop off passengers. The Saikyō Line was notorious for having the highest report of groping-related incidents (known as chikan) in Tokyo.[1] This problem was directly addressed by installments of women-only passenger cars, which are cars that are temporarily off-limits to men during rush hours, and indirectly addressed by reducing overcrowding problems as a whole.

    There are three types of trains on the Saikyō Line: Local trains (普通), Rapid trains (快速) and Commuter Rapid trains (通勤快速). Between Ōmiya and Akabane, Rapid trains only stop at Toda-Kōen, Musashi-Urawa and Yono-Hommachi, while Commuter Rapid trains, which run during rush hours, stop only at Musashi-Urawa. South of Akabane, as well as on the Kawagoe and Rinkai lines, all trains make all scheduled station stops.


    The equipment used on the Saikyō line consists of 205 series EMU trains owned by JR East, and TWR 70-000 series EMU trains owned by Tokyo Waterfront Area Rapid Transit (only used on Rinkai Line through services).


10,000 Posts and Videos at What Gets Me Hot's BETTER HALF are NOT gonna 'like' themselves on Facebook or Twitter Thanks for liking! Hope to See Ya At What Gets Me Hot Facebook Page!